Tp88 500/5A AC current transformer 1A output current transformer clamp CT

 Features                                                                                       

Featured Products


Tp88 500/5A AC Current Transformer 1A Output Current Transformer Clamp CT

 
Features       
                                                                                                                                  

1) Double-screw fastening, safe, easy to install, portable

2) Two built in fixing methods: Base; Busbar mounting

3) Wide inner window, allowing clamping of big cables or bus-bars

4) Wide range of sizes to accommodate all the existing installations.

5) Primary current from 5A to 5000A
 

 Specification      

ModelNominal current ratio                                           Burden(VA)/Accuracy
0.51.0
DP-88250/5A/1.5
300/5A/1.5
400/5A/2.5
500/5A1.52.5
600/5A1.52.5
800/5A3.755
1000/5A7.57.5

 

Note: The Current Ratio above are common type, that's ok to customise the ration according to 

customers' requirement. HEYI ELE. Co.,LTD could provide professional OEM service :)


Installation      
Tp88 500/5A AC Current Transformer 1A Output Current Transformer Clamp CT


Applications  

1) Current measurement, monitoring and protection for electrical wiring and equipment.

2) Current and power measurement for electric motors, lighting, air compressor, heating

and ventilation system, air-condition equipment and automation - control system.

3) Current, power and energy monitoring device.

4) Relay protection device.                                                                                                                                              

The advantages of HEYI DP split core ct 
Tp88 500/5A AC Current Transformer 1A Output Current Transformer Clamp CT
 

How to Order?
1. Please let us know what kind of model, color, poles and rated current etc.
2. Proforma invoice (PI) will be sent to you.
3. Please check and confirm the PI.
4. Once we confirmed the order, please pay it soon.
5. After full payment, all goods will be sent to you in 6-10 days as usual.
6. OEM/ODM is welcomed. Free OEM for more than 5000 sets orders.
 
 
Shipping:
1. Products are shipped via UPS / DHL / EMS / HK EMS / FedEx / TNT and so on expresses (door to door).
2. We Provide Drop shipping Service.
3.5 days delivery upon receiving payment if the qty is lower than 1000PCS and it is not customized products.
4. In order to ensure you receive your order tax free upon import, we declare lower value.
5. Shipping via EMS. UPS. FedEx and TNT express usually takes 3~7days dependent on the destination country.
 
 
Payment:
1. We accept Western Union and T/T
2.30% deposit and 70% before shipping
3. No payment collection. We only can deliver goods after getting full payment.
 
 
Warranty:
1. We provide 1 year warranty.
2. If the product is defective, please notify us within 3 days of delivery.
3. All products must be returned on their original condition, in order to qualify for a refund or exchange of goods

FAQ:
1) What is the difference between a moulded case current transformer and a split core current transformer?

A moulded case current transformer is a solid ring of steel in a plastic or resin case and can only be used when you fit the cable through the hole in the middle of the plastic/resin case.
 
A split core current transformer is manufactured with the steel core in two pieces. This enables the core to be separated, allowing you to fit the cores around the cable without disconnecting the cables. The disadvantage with split core current transformers is that they can be larger than standard moulded case and the price is approximately four times more expensive.

2) Which way round do the Current Transformers go?
The current transformers must be fitted and connected in the correct way or the meter will not be accurate. The current transformers are marked on two sides: 'P1' and 'P2.' 'P1' must face the mains side and 'P2' must face the load side. 'S1' must be connected to the main side of the meter and 'S2' to the load side. Refer to appropriate wiring diagram of the meter for correct connections.

3) Can the current transformers be a higher or lower ratio then my maximum load?
The current transformers should ideally be about 80% of the normal running load, thus allowing a 20% allowance of increasing the load in the future.

 

Contact us:
Send your Inquiry Details in the Below, Click "Send" Now!

YOUR BENEFITS IS OUR BUSINESS!!!               

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours