25mm 40mm window size meter CT current transformer for measuring current

Product Description1.Product pictures2.Features:Low costWater proof2 outline size5.0,1.0,0.2&0.1Aac secondary ratios available3.Applications:Current,Power, Energy monitoring devicesRelay protection device4.Specification:Shell material:ABSFrequency:50-400 HzOperating Temperature:-25 to +55ºC,-40 to +85ºC o

Featured Products

Product Description
1.Product pictures
25mm 40mm Window Size Instrument CT Current Transformer for Measuring Current

2.Features:
Low cost
Water proof
2 outline size
5.0,1.0,0.2&0.1Aac secondary ratios available

3.Applications:
Current,Power, Energy monitoring devices
Relay protection
 device


4.Specification:
Shell material:ABS
Frequency:50-400 Hz
Operating Temperature:-25 to +55ºC,-40 to +85ºC optional
Operating Voltage:600Vac
Isolation:600V,BIL 10KV Full Wave 
Accuracy class:compliantIy IEC 61869-2
RoHS compliant.

4.Outline dimension

25mm 40mm Window Size Instrument CT Current Transformer for Measuring Current

5
.Details of the data

ModelWindow size(mm)Compliant IEC60044-1@50/60Hz
Turn ratio2.5VA5VA12.5VA
GWTTA79A1125100:53  
150:51  
200:50.51 
250:50.50.5 
300:50.50.5 
GWTTA791140150:51  
200:51  
250:50.51 
300:50.51 
400:50.50.5 

Company introduction

1.certification

We have passed ISO9001:2015,CE,SGS approval and IEC report
Low Loss Electrical Power Voltage Transformer with ISO9001: 2015
Low Loss Electrical Power Voltage Transformer with ISO9001: 2015


2.Company profile
     Tianjin Grewin is concentrating on transformers for 20 Years and complianted by ISO9001:2015,CB,IEC CB,CE etc.We're always pay great attention to its business philosophy "Quality and Honesty First".GWSCTC660A series retro-fit (split-core) current transformer has been specially designed to facilitate their installation in new or already existing net works. They may be installed without opening any cable or bus-bar circuit. An internal precision resistor across the secondary winding of the CT provides a low safe voltage output. It can save time and the installation costs.windely used in communications,electronics,meters,industrial control,medical equipments and other fields.We are also a provider of power meters and instruments locators. 85% of its products exported to America, Europe, and Asia etc.We sincerely invite you to join us to create a bright future.

Low Loss Electrical Power Voltage Transformer with ISO9001: 2015

3.Terms of Shipment:

Within 10 working days after received related prepayment or L/C.

4.Payment terms:
(1)T/T 100% or 50% deposit by T/T in advance, balance amount to be paid 7 days before
delivery.
(2) By irrevocable L/C at sight, to be issued immediately against confirmed order.
(3)Payment by T/T, if order amount is less than USD 20,000.

5.Production
The following picture showed you about all finished transformer production line and package with export standard carton and strong pallets:
25mm 40mm Window Size Instrument CT Current Transformer for Measuring Current

6.Warranty:
(1)We provide 1 year warranty.
(2)If the product is defective, please notify us within 3 days of delivery.
(3)All products must be returned on their original condition, in order to qualify for a refund or exchange of goods

7.Why choose us?

Quality and honest first!
A. Flexible service for diffierent transformers with high efficiency performance.
B. Over 40 years experience of transformer designing and producing.
C.100% test of every single product we produce from incoming material checking.
D. UL, CE, ISO9001:2008
E. We offer custom-made transformers, OEM and ODM are welcome
F. We deliver the quality you expect at consistently competitive prices
G.Transformer quality lifetime:10 Years.
H.Specialty Sales service:5 -10 Years

8.Flow chart of trading activities:


NO

Step

Days need

1

Request for quotation

1 day

2

Making quotations

1 day

3

Offer and counter offer

3 days

4

Sending and receiving samples

3-10 days

5

Sample confirmation

3 days

6

Placing a firm order

1 day

7

Paying and receiving the down payment

1-4 day

8

Factory production & Quality inspection

15-20 days

9

Paying and receiving the balance

4 days

10

Delivery of goods

1 days

9.contact

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours